Mount Assembly¶
Use this page as your step-by-step build checklist.
Mount reference images¶


Assembly steps¶
- Dry-fit
- Phone inserts smoothly
-
No force required
-
Install fasteners / inserts (if used)
-
Do not overtighten into plastic
-
Add straps/velcro
-
Straps should not cover camera/IMU areas
-
Vibration damping (optional)
- Add pads only where they do not allow “wobble”
Mount QA checklist¶
- Phone is centered and stable
- Camera view is clear
- No contact with moving parts
- No sharp edges / abrasion points